Photo By: Kevin Morgan
 

The westbound Zephyr climbs up from Coal Creek Canyon toward the east portal of Tunnel 1. If Amtrak does not back off its plan to reduce service, then the Zephyr is going to go from a daily train to a thrice-weekly train starting in about two weeks. Time will tell if this is actually going to happen.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

816
views
0
comments
Monday, September 21, 2020 at 9:28:43 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tunnel 1 (MP 23.4, 366 ft)




Train Information
Railroad
Amtrak
Model
P42DC
Unit Number
AMTK 40

Symbol
AMT5-20
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/800 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.