Photo By: Kevin Morgan
 

BNSF trains have basically become the staple of the Moffat, particularly in the last 2-3 years. With coal virtually gone at the moment, and UP only running a manifest three days a week each way (so one manifest each of six days of the week), BNSF has kept some trains moving on the Moffat with an average of two manifests (one each way) per day.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

647
views
0
comments
Friday, June 4, 2021 at 7:46:33 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
West of Leyden




Train Information
Railroad
BNSF
Model
ES44DC
Unit Number
BNSF 7678

Symbol
HPVODEN1-03A
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 6D Mark II
ISO
125
Flash
Did Not Fire

Focal Length
100 mm
Shutter
1/400 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.