Photo By: Kevin Morgan
 

On a crystal clear June day, UP's Grand Junction to North Yard manifest rolls down the main at Leyden on a Clear (green) signal. The tracks here parallel 82nd Avenue on either side. There is (obviously) no bridge to connect 82nd Avenue over the tracks, so it continues east on the north side of the tracks and west on the south side of the tracks. There have been talks of building a bridge over the tracks here that would connect Alkire Street. So far, those have indeed only been talks.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

574
views
0
comments
Friday, June 4, 2021 at 10:59:34 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Leyden (7,020ft)




Train Information
Railroad
Union Pacific
Model
ES44AC
Unit Number
UP 7740

Symbol
MGJNY-03
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/730 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.