Photo By: Kevin Morgan

The Rocky Mountaineer took the siding at Azure to meet the westbound MNYGJ. The UP manifest picked up a string of cars at Granby, which included a bunch of Herzog cars. The dispatcher probably should have held the manifest at Gore. After clearing the east switch at Azure, the switch would not align for the siding. The crew had to take the switch in hand throw and the flagged out of Azure. This delay was long enough that I had to head east without the train in order to get home for 4th of July celebrations, making this the last picture of the day.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

534
views
0
comments
Sunday, July 4, 2021 at 12:55:15 PM
image date



Location Information
City or County and State
Grand County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS111 (East Azure)




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None

Symbol
MNYGJ-04
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 6D Mark II
ISO
200
Flash
Did Not Fire

Focal Length
180 mm
Shutter
1/400 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.