Photo By: Kevin Morgan
 

An eastbound UP coal load sits in the siding at Rocky, meeting the westbound Zephyr which rolls by on the main. After the Zephyr passes, the coal load will get a clear (green) signal to continue east to Denver. There, it will get a crew change and continue east on the Limon Sub.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

430
views
0
comments
Tuesday, August 30, 2022 at 10:36:21 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Rocky (7,330ft)




Train Information
Railroad
Amtrak
Model
P40DC
Unit Number
AMTK 824

Symbol
AMT5-29
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic Air 2 [FC3170]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/730 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.