Photo By: Kevin Morgan
 

The westbound Rocky Mountaineer: Rockies to the Red Rocks emerges from the shortest tunnel in the Tunnel District, Tunnel 29. The tunnel is only 78 feet long! The trains has been following South Boulder Creek for several miles, and only now is the elevation of the creek getting close to that of the tracks. This is the first revenue run of the Rocky Mountaineer for the 2023 season.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

203
views
0
comments
Sunday, April 16, 2023 at 11:01:52 AM
image date



Location Information
City or County and State
Gilpin County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tunnel 29 (MP 36.4, 75 ft)




Train Information
Railroad
Rocky Mountaineer
Model
GP40-3
Unit Number
RMRX 8020

Symbol
PDVGSJ-16
Paint Scheme  



Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
150
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/1250 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.