In between Tunnels 2 and 3, three SD70ACes have this westbound oil empty on the move. In September 2013, the large fill on the left side of the frame was washed out by record levels of rail fall. The Moffat was closed for about a week as UP worked tirelessly to rebuild the fill.
Email Questions or Comments to the Webmaster.