Photo By: Kevin Morgan
 

A BNSF manifest is slowing to around 35 MPH in preparation for the multiple curves it is approaching. The curves provide for a minimal grade...around 1%...for the climb from Grassy up to the siding of Cedar and points west as the train gets closer to the real start of Soldier Summit.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

229
views
0
comments
Saturday, May 13, 2023 at 12:18:03 PM
image date



Location Information
City or County and State
Emery County, UT

Subdivision
Green River (UP)

Milepost or Control Point
Grassy to Cedar




Train Information
Railroad
BNSF
Model
SD70ACe
Unit Number
BNSF 8549

Symbol
HDENPVO1-12A
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/500 seconds
Aperture
f/4.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.