Photo By: Kevin Morgan

The eastbound Zephyr is making its station stop on the siding at Green River, about 1 hour and 45 minutes behind schedule. Most sidings are perfectly parallel the main track they are next to. Green River, however, is an example of one that strays slightly from the mainline alignment.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

217
views
0
comments
Sunday, May 14, 2023 at 9:50:14 AM
image date



Location Information
City or County and State
Green River, UT

Subdivision
Green River (UP)

Milepost or Control Point
Green River




Train Information
Railroad
Amtrak
Model
None
Unit Number
None

Symbol
AMT6-13
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/160 seconds
Aperture
f/4.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.