Photo By: Kevin Morgan
 

The signal bridge at C&S Jct spans four tracks, protecting Bypass 1 and 2 turning in to Main 1, and Main 3 and the North Yard siding turning in to Main 2. A westbound coal empty, with UP 1995, sits on Bypass 1 alongside the Clear Creek Federal commuter rail station, waiting for a crew to take it west.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

252
views
0
comments
Sunday, May 21, 2023 at 3:39:02 PM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS005 (C&S Junction)




Train Information
Railroad
Union Pacific
Model
SD70ACe
Unit Number
UP 1995

Symbol
Paint Scheme  

Future Number(s)
UP 8522




Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/2500 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.