Railroad photograph
Photo by: Kevin Morgan
Although there is no train present, the interlocking at Utah Jct is a fascinating one. In addition to being the north end of North Yard, the main track for UP's Moffat Tunnel Sub and the main track for BNSF's Front Range Sub both cross UP's Belt Industrial Lead which leads to UP's Greeley Sub. A crazy number of tracks, switches, and signals are at this control point. Here, a red signal protects the diamond where BNSF's Front Range Sub and UP's Belt Industrial Lead cross. The signals are controlled by UP's dispatcher in Omaha, NE.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

440
views
0
comments
Sunday, June 11, 2023 at 10:59:06
image date



Location Information

City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS003 (Utah Junction)




Train Information
Railroad
Union Pacific, BNSF
Model
None
Primary Unit Number
None

Paint Scheme
Symbol
Train Type
0-None



Photo Information
Camera Make/Model
DJI / Mavic 3 [FC4170]
ISO
110
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/120 seconds
Aperture
f/4.4