Photo By: Kevin Morgan
 

Typically, the manifest trains BNSF runs on the Moffat, whether east or west, run with a 3x2 configuration. On this particular day, the Provo-Denver has six units on the head end. Although a few of them are just catching a ride on the train and are not actually loading.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

126
views
0
comments
Monday, December 4, 2023 at 2:59:15 PM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Leyden (7,020ft)




Train Information
Railroad
BNSF
Model
ES44AC
Unit Number
BNSF 5970

Symbol
HPVODEN1-03
Paint Scheme  



Photo Information
Camera Make/Model
Canon / Canon EOS 6D Mark II
ISO
800
Flash
Did Not Fire

Focal Length
400 mm
Shutter
1/400 seconds
Aperture
f/7.1


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.