The westbound Zephyr diverges through the switch at East Plain and in to the siding, meeting an eastbound UP coal train that is holding the main. The conductor for that coal load is on the ground, ready to give a "roll by" to the Zephyr.
Email Questions or Comments to the Webmaster.