|
A coal empty on the left is tied down on Main 3 as a coal load is in Run 8 pulling southbound on Main 1. An SD70ACe and a pre-production ES44AC lead the load through the Littleton Trench.
Email Questions or Comments to the Webmaster. | ||||
| ||||
|
| |||||||
|
| |||||||
| |||||||
|
| |||||||
| |||||||
|
| |||||||
|
|
|
|
A coal empty on the left is tied down on Main 3 as a coal load is in Run 8 pulling southbound on Main 1. An SD70ACe and a pre-production ES44AC lead the load through the Littleton Trench.
Email Questions or Comments to the Webmaster. | ||||
| ||||
|
| |||||||
|
| |||||||
| |||||||
|
| |||||||
| |||||||
|
| |||||||
|
|
|