UP 1943 leads a loaded eastbound oil train out of Tunnel 1, slowly descending down the 2% grade. UP runs loaded oil trains very slow, typically coming down from the Moffat at right around 15 MPH. This beautiful June evening is no different.
Email Questions or Comments to the Webmaster.