A pair of P42DCs (both in Phase 5) are power on a typical Zephyr consist this morning as the train passes by Oberon Lake #1 in Arvada. The Zephyr is roughly halfway between the control point at Arvada (CP DS007) and the east switch of Leyden (CP DS012).
Email Questions or Comments to the Webmaster.