Photo By: Kevin Morgan

Although there are no trains in the shot, Gross Reservoir is a landmark that few people on the California Zephyr miss when rolling through Crescent. A massive, roughly five year project is underway right now to raise the dam by 131 feet. That increase will increase the capacity of reservoir by nearly 200%! The reservoir currently has a capacity of 13.6 billion gallons. That will increase to 38.7 billion gallons once the project is finished. As you can see, reinforcements to the front of the dam have started and is slowly climbing the dam.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

51
views
0
comments
Friday, August 16, 2024 at 10:02:08 AM
image date



Location Information
City or County and State
Boulder County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point




Train Information
Railroad
None
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/640 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.