Photo By: Kevin Morgan
 

Since the Dotsero Cutoff was completed in the summer of 1934, the owner of the line (Rio Grande, Southern Pacific, and Union Pacific) ran manifests between Denver and Salt Lake City. That is, until December 2018 when UP ran the last MRONY (Roper, UT to North Yard, CO). Amazing it has been almost six years since then! Now, UP runs a manifest three days a week between Denver and Grand Junction (and back). Here, the eastbound version of the MGJNY is leaving the east end of Leyden.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

74
views
0
comments
Friday, August 30, 2024 at 10:08:48 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS012 (East Leyden)




Train Information
Railroad
Union Pacific
Model
C44AC-CTE
Unit Number
UP 5480

Symbol
MGJNY-29
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
100
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/1250 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.