Photo By: Kevin Morgan

Construction continues on the Gross Dam project. The project will ultimately raise the dam by 131 feet, tripling the capacity of the water in the reservoir. As you can see, the dam is being reinforced by thickening the front of the dam. Once the reinforcements has risen to the height of the existing dam, it will continue to build upward.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

64
views
0
comments
Sunday, September 1, 2024 at 4:27:18 PM
image date



Location Information
City or County and State
Boulder County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Crescent (5,550 ft)




Train Information
Railroad
None
Model
None
Unit Number
None

Symbol
Paint Scheme  




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/320 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.