A very short BNSF manifest is tied down in the siding at Rocky, awaiting a recrew. Note that the derail is set at the east end. This is to protect against the possibility of the train rolling out onto the main track. Were the train to roll, it would be derailed away from the main track. Fortunately, the likelihood of that happening is near zero as the train has hand brakes applied on the train, and the engines are continually charging the brake line to keep the train brakes applied.
Email Questions or Comments to the Webmaster.