UP 6360, former SP 316, leads an eastbound loaded oil train underneath Central Park Blvd. Half of this overpass was built in 2012 to accommodate the growing commercial and residential neighborhoods on the former Stapleton International Airport land. At that time, the bridge carried one lane of traffic each direction. In 2018, the bridge was doubled in width, and there are now two lanes in each direction on the bridge. The train is about to cross Sand Creek on Main 1.
Email Questions or Comments to the Webmaster.