The morning Zephyr is in the control point of Fox Jct (CP DS001). Construction on the pedestrian overpass started in 2014, and was completed and opened in 2015. It connects a lot of new apartments and condos on the west side of the tracks with the RTD B and G-Line Commuter tracks on the east side of the tracks.
Email Questions or Comments to the Webmaster.