Photo By: Kevin Morgan
 

On the south edge of Big Ten Curve, the Zephyr is making its way west. The Zephyr has not seen many ALC-42 Chargers, the power set to (largely) replace the P42DCs. The Chargers are Tier-4 compliant, and they require special additives mixed in with their fuel. the infrastructure currently does not exist in Denver to include the additives, so the Chargers have not been running on the Zephyr. Rumors are that the infrastructure will be added soon, and Chargers are likely to start showing up in 2025. That means this classic consist may be short-lived.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

52
views
0
comments
Friday, December 13, 2024 at 10:51:44 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Big Ten Curve (MP 19.5 to MP 20.2)




Train Information
Railroad
Amtrak
Model
P42DC
Primary Unit Number
AMTK 30

Paint Scheme
Amtrak Phase 5b
Symbol
AMT5-12
Train Type
California Zephyr (Amtrak)



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
100
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/1250 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.