Photo By: Kevin Morgan
 

Here we are at milepost 0 here at CP DS000 (Prospect Jct). Mileposts start counting up on the Moffat Tunnel Sub (the way the camera is looking). Mileposts also start counting up south on the Joint line (behind the camera). UP's MNYPU is currently stopped on Main 1 just north of the signal protecting Prospect Jct. You can clearly still see the switch is bent toward Main 2 on the empty track. The westbound Zephyr came through here about 25 minutes earlier.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

36
views
0
comments
Sunday, December 15, 2024 at 9:24:54 AM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS000 (Prospect Junction)




Train Information
Railroad
Union Pacific
Model
ET44AC
Unit Number
UP 2692

Symbol
MNYPU-15
Paint Scheme  



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/800 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.