Photo By: Kevin Morgan

The front half of a coal load backs through the OS at Pecos Crossover on Bypass 2. It is approaching the back half of its train, ready to connect up after cutting out mid-train DPUs.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

81
views
0
comments
Sunday, December 22, 2024 at 2:11:04 PM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS004 (Pecos X-Over)




Train Information
Railroad
Union Pacific
Model
None
Primary Unit Number
None

Paint Scheme
Symbol
Train Type
Unit Coal




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
100
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/100 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.