Railroad photograph
Photo by: Kevin Morgan
After waiting for about 15 minutes at Arvada (CP DS007), this BNSF oil empty gets its turn on the single track main of the Moffat to head west. As is pretty common on BNSF oil trains, six units are on the head end of the train, though only three of the units are actually online and loading. The trailing three are currently just catching a ride.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

385
views
0
comments
Tuesday, December 31, 2024 at 10:12:51
image date



Location Information

City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Arvada to Leyden (MP 7.5 to MP 11.9)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 6271

Paint Scheme
BNSF New Image
Symbol
UKCNWGN0-48T
Train Type
Unit Oil


Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/500 seconds
Aperture
f/3.4