Photo By: Kevin Morgan
 

Crossing over South Boulder Creek, two DPUs bring up the tail end of the Provo-Denver at Cliff. A pair of units DPU'd on the back of a manifest is pretty standard for BNSF manifests running on the Moffat.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

24
views
0
comments
Friday, January 3, 2025 at 1:20:48 PM
image date



Location Information
City or County and State
Glipin County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Cliff (6,900 ft)




Train Information
Railroad
BNSF
Model
ES44C4
Primary Unit Number
BNSF 8396

Paint Scheme
BNSF New Image
Symbol
HPVODEN1-02A
Train Type
Manifest

Additional Unit Number(s)
BNSF 9377
   



Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
150
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/2000 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.