Photo By: Kevin Morgan

This westbound Denver-Provo manifest is (and has been) stuck in the siding at Tolland for quite awhile. The train met an eastbound BNSF oil train, waited for the Moffat Tunnel to vent, then waited for the Winter Park Express (that is what it is waiting for now). After that, the tunnel had to vent again, before the train departed west to meet the Zephyr at Winter Park.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

33
views
0
comments
Sunday, January 12, 2025 at 4:32:28 PM
image date



Location Information
City or County and State
Gilpin County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tolland (9,356 ft)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 6239

Paint Scheme
BNSF New Image
Symbol
HDENPVO1-11A
Train Type
Manifest



Photo Information
Camera Make/Model
Canon / Canon EOS 6D Mark II
ISO
800
Flash
Did Not Fire

Focal Length
220 mm
Shutter
1/320 seconds
Aperture
f/5


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.