Around 20 years after BNSF first unveiled its "New Image" or "Swoosh" paint scheme, you can still find Heritage 2 units on the rails. Indeed, here are two such units, both rear DPUs on the trains heading away from each other at the south end of the siding of Longs Peak. The siding of Longs Peak was actually built around 2004. Prior to that, there was a 60-mile gap between the siding of Broomfield and North Yard (in Fort Collins). Most trains could not fit on the relatively short siding at Boulder, so the introduction of Longs Peak help move traffic on the line.
Email Questions or Comments to the Webmaster.