Photo By: Kevin Morgan
 

An Intermountain Power coal train is leaving the main tracks at Colton, and is headed up the Pleasant Valley Sub. Intermountain Power is planning to end its use of coal by the end of 2025, which is certainly have an impact on the number of coal trains that run on Soldier Summit.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

13
views
0
comments
Saturday, May 03, 2025 at 1:18:21 PM
image date



Location Information
City or County and State
Utah County, UT

Subdivision
Pleasant Valley (UP)

Milepost or Control Point
Colton Yard (MP 1)




Train Information
Railroad
Union Pacific
Model
C44ACM
Primary Unit Number
UP 7077

Paint Scheme
UP Nose Flags/Shield
Symbol
Train Type
Unit Coal




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
120
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/1600 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.