Photo By: Kevin Morgan
 

UP's MGJNY is stopped on the main at Eisele (Clay) as an eastbound BNSF Provo-Denver runs through the siding at overtakes the UP manifest. Both of the crews on these trains are short on time, but BNSF is running on less time than UP, so DS-380 gave them the priority to allow them to continue into town first.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

44
views
0
comments
Wednesday, May 21, 2025 at 10:19:23 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Eisele (Clay) (5,780 ft)




Train Information
Railroad
BNSF
Model
SD70MACe
Primary Unit Number
BNSF 9738

Paint Scheme
BNSF New Image
Symbol
HPVODEN1-20A
Train Type
Manifest



Photo Information
Camera Make/Model
Hasselblad / Mavic 3 / Mavic 3 Pro [L2D-20c]
ISO
100
Flash
Did Not Fire

Focal Length
24 mm
Shutter
1/1600 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.