CN 3321, an AC44C6M (rebuild) crosses over East Plum Creek on the bridge at MP 26.60 on Main 1 on the Joint Line. The train is following a coal load, and is actually making better time than the coal load, so the grain train will make a few stops at (red) intermediate signals as it continues south.
Email Questions or Comments to the Webmaster.