The crew for this westbound coal empty was called about five hours earlier at 8am, before the train had actually arrived on Bypass 1 in Denver. Once arriving, the crew had to shuffle some power around. Alas, the SD70ACe in the fourth position is not loading, and the train is limping into Leyden to check the problem. It would turn out to be a faulty MU cable, and not a problem with the unit itself. After replacing the MU cable, the unit started loading and the train continued west after a 15 minute delay.
Email Questions or Comments to the Webmaster.