The Rocky Mountaineer has slowed to a stop on the main at East Portal. Ahead, the Moffat Tunnel is still venting from the Zephyr passing through about 30 minutes ago. Until the tunnel finishes venting, the train will have to wait.
Email Questions or Comments to the Webmaster.