Photo By: Kevin Morgan
 

This eastbound loaded oil train has been making track speed since Cliff, but is coming up on a 15 MPH slow order. The slow order is about a mile long, and there is a second two mile long slow order around Big Ten Curve. The crew only has 70 minutes remaining on the clock, so the train will take the siding at Rocky and tie down.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

109
views
0
comments
Sunday, August 31, 2025 at 11:19:04 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS024 (East Plain)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 5830

Paint Scheme
BNSF New Image
Symbol
Train Type
Unit Oil




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/500 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.