It is not particularly often than you see a loaded coal train on the Moffat with six units on the head end in 2025. Traditionally, UP's "preferred" setup for coal loads has been 2x3x1. In this case, this shorter-than-normal coal train was configured as 4x2. However, after breaking a drawbar overnight, two units came out of Denver and were added to the head end, making the train the 6x2 that it now is.
Email Questions or Comments to the Webmaster.