At the west switch of Crescent, the westbound Zephyr rolls through the OS on a green signal. In the distance, construction continues on increasing the height of the dam at Gross Reservoir. The height of the dam was originally 340 feet. It has been increased roughly 60 feet so far, with another 71 feet to go. The dam will be 471 feet tall once complete, tripling the capacity of the reservoir.
Email Questions or Comments to the Webmaster.