A Union Pacific tie extractor is pulling designed old ties out from underneath the rails, leaving them along the right of way. A hundred feet or so behind the extractor, a crane is working to clean up the old ties. It is picking them up three or so at a time and putting them in piles along the right-of-way to be picked up by a work train in the future.
Email Questions or Comments to the Webmaster.