An eastbound BNSF train arrived in the siding here at Rocky about two hours earlier and was promptly tied down. The train is setup in the standard (for BNSF) 3x(0)x3 oil train configuration. Piles of new ties waiting to be installed line both the main and the siding.
Email Questions or Comments to the Webmaster.