Photo By: Kevin Morgan

An eastbound BNSF train arrived in the siding here at Rocky about two hours earlier and was promptly tied down. The train is setup in the standard (for BNSF) 3x(0)x3 oil train configuration. Piles of new ties waiting to be installed line both the main and the siding.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

8
views
0
comments
Wednesday, November 26, 2025 at 9:40:40 AM
image date



Location Information
City or County and State
Arvada, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Rocky (7,330ft)




Train Information
Railroad
BNSF
Model
SD70ACe
Primary Unit Number
BNSF 8423

Paint Scheme
BNSF New Image
Symbol
Train Type
Unit Oil




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
110
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/640 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2025 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.