When pulling out of Track 4 to move the Winter Park Express equipment over to Track 5, the derail out of Union Station was not aligned. One of the engineer's from AMTK 199 is on the ground and will hand-throw the derail. An RTD N-Line train is arriving Union Station to the left as a G-Line train is arriving to the right.
Email Questions or Comments to the Webmaster.