Photo By: Kevin Morgan

The crew on this BNSF manifest has been stuck here at Rollins for several hours at this point. They met an eastbound coal load, then had the Winter Park Express and a UP oil empty run west around them. Now, they are waiting on an eastbound BNSF oil load. Then, it should finally be their turn to continue west to Tolland to let the westbound Zephyr run around it.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

21
views
0
comments
Friday, February 06, 2026 at 9:18:51 AM
image date



Location Information
City or County and State
Gilpin County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Rollins (8,320 ft)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
None

Paint Scheme
BNSF New Image
Symbol
HDENPVO1-06A
Train Type
Manifest



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
180
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/1250 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.