A pair of GEs brings up the end of a westbound coal empty on Main 3 as a coal load heads east on Main 2. Even though the Orin Sub basically runs north/south, trains headed north run timetable west and trains headed south run timetable east.
Email Questions or Comments to the Webmaster.