Photo By: Kevin Morgan
 

As we getting closer to the end of the day, we find BNSF 8463 slowly making its way up the 1% grade of Logan Hill on Main 3. The empty hoppers you see on Main 4 are just in storage. Construction on Main 4, which is roughly 20 miles long, was started in 2006 and completed in 2008. The fourth main was a $100 million investment by both UP and BNSF. Coal output was so great at that point that the fourth main was justified due to the grade on Logan Hill and the slow moving loads. However, with the substantial decrease in coal demand, three mains is sufficient for Logan Hill, and Main 4 has been used to store multiple coal train sets for over a decade now.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

3
views
0
comments
Saturday, August 15, 2026 at 6:51:46 PM
image date



Location Information
City or County and State
Converse County, WY

Subdivision
Orin (BNSF)

Milepost or Control Point
Logan Hill




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 8463

Paint Scheme
BNSF New Image
Symbol
Train Type
Unit Coal




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
890
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/200 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.