A Union Pacific coal empty is waiting for its turn to start loading as a BNSF train (with an MRL SD70ACe in the consist) is in the process of loading. Black Thunder can load a 125-car train in about two hours. With a 30 minute break (give or take) between, the mine could probably load around 10 trains in a 24 hour period.
Email Questions or Comments to the Webmaster.