Photo By: Kevin Morgan
 

The westbound Zephyr took the siding at Crescent. The westbound Denver-Provo manifest went into emergency and stopped just shy of the west switch. The conductor is walking back to the head end after inspecting the train (and finding nothing). The train will soon continue west and take the siding at Cliff to allow the Zephyr to overtake it.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

3
views
0
comments
Sunday, September 20, 2026 at 10:47:15 AM
image date



Location Information
City or County and State
Boulder County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS032 (West Crescent)




Train Information
Railroad
BNSF
Model
AC4400CW
Primary Unit Number
BNSF 5668

Paint Scheme
BNSF Heritage 2
Symbol
HDENPVO1-20A
Train Type
Manifest



Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4370]
ISO
100
890
Flash
Did Not Fire

Focal Length
166 mm
Shutter
1/320 seconds
Aperture
f/3.4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.