Photo By: Kevin Morgan
 

Quite a bit of action is happening here at the Pecos Crossover right now, particularly for a Sunday afternoon. UP 8134 leads a westbound coal empty onto Bypass 2. The crew on a coal load on Bypass 1 is working to put the train back together after cutting out the mid-train swing helpers. And, those exact mid-train swing helpers are on Main 3 in the distance, being taken to the engine tracks in North Yard.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

3
views
0
comments
Sunday, September 27, 2026 at 1:43:39 PM
image date



Location Information
City or County and State
Denver, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
CP DS004 (Pecos X-Over)




Train Information
Railroad
Union Pacific
Model
ES44AC
Primary Unit Number
UP 8134

Paint Scheme
UP Flag/Lightning/Wings
Symbol
Train Type
Unit Coal




Photo Information
Camera Make/Model
DJI / Mavic 3 Pro [FC4382]
ISO
100
888
Flash
Did Not Fire

Focal Length
70 mm
Shutter
1/1600 seconds
Aperture
f/2.8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.