Photo By: Kevin Morgan
 

After meeting an eastbound oil train at Rollins, this westbound train found a little bit of light as it approaches the grade crossing at Tolland. After meeting the Zephyr at Rollins, DS-378 gave the crew the option of waiting at Rollins for the eastbound oil train, or moving up to Tolland. The crew opted to wait at Rollins, likely to give the Moffat Tunnel time to vent by the time they made it up to the tunnel.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

5
views
0
comments
Sunday, September 27, 2026 at 5:05:57 PM
image date



Location Information
City or County and State
Boulder County, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
Tolland (9,356 ft)




Train Information
Railroad
BNSF
Model
ES44AC
Primary Unit Number
BNSF 5652

Paint Scheme
BNSF Heritage 2
Symbol
Train Type
Unit Oil




Photo Information
Camera Make/Model
Canon / Canon EOS 6D Mark II
ISO
200
802
Flash
Did Not Fire

Focal Length
400 mm
Shutter
1/320 seconds
Aperture
f/6.3


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2026 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.