|
|
|
|
|
Sunday, August 16, 2026
|
Kevin Morgan
|
|
|
|
West Bill to Crossover 74.0
Converse County, WY
|
69 (Add a Comment)
|
|
|
|
|
Orin (BNSF)
|
Union Pacific
|
As an eastbound UP coal load approaches on Main 1, descending from Logan Hill, let's talk a bit about coal production in the Powder River Basin. UP and BNSF invested $100 million between 2006 and 2008 to add a fourth main track over Logan Hill. 2008 holds the record for high point of coal production, with roughly 496 million short tons of coal taken out of the basin. That translated to somewhere around 100 trains per 24 hours. With the reduction in demand for coal, output has steadily been decreasing. In 2024, roughly 191 million short tons were taken out. That comes out to about 36 trains per 24 hours. It is no wonder that Main 4 is now being used for storage of cars!
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Saturday, August 15, 2026
|
Kevin Morgan
|
|
|
|
Bill Yard
Bill, WY
|
75 (Add a Comment)
|
|
|
|
|
Orin (BNSF)
|
Union Pacific
|
While the Orin Sub is jointly owned by both BNSF and Union Pacific, their operations in the sub are a bit different. UP has a small holding yard at Bill which is exclusively owned and used by Union Pacific, not BNSF. Depending on hours on the clock, some UP trains will stop at Bill for a crew change. There is a Travelodge across WY-59 from the yard that away crews use to rest. This was originally a Chicago & North Western holding yard before Union Pacific bought CNW in 1995. A southbound coal load is waiting for a rested crew in the hold yard here at Bill.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Saturday, August 15, 2026
|
Kevin Morgan
|
|
|
|
Crossover 91.0 to East Bill
Converse County, WY
|
92 (Add a Comment)
|
|
|
|
|
Orin (BNSF)
|
BNSF
|
When Burlington Northern first built a line into the Powder River Basin in the early 1972s, it was just a single track with some sidings. However, with coal mines rapidly expanding, BN started a second main in 1976. The line was largely two track (with single track sections in the 1980s). A third main (10 miles) was added over Logan Hill in 1986. Today, the entire 127-mile sub is (at least) triple track, as seen here with this three train meet south of Bill.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Sunday, August 16, 2015
|
Kevin Morgan
|
|
|
|
South of Bill
Converse County, WY
|
1568 (Add a Comment)
|
|
|
|
|
Orin (BNSF)
|
BNSF
|
In addition to a staging yard for BNSF, there is a car repair facility located a few miles south of Bill, WY in the Powder River Basin. Considering how many coal cars run across the line in a 24 hour period (if you include trips to and from the mine, that number a good estimate is 18,400 cars per 24 hours!), it makes sense to have a facility onsite that can handle repairs.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|
|
|
|
Monday, August 11, 2008
|
Kevin Morgan
|
|
|
|
Bill
Bill, WY
|
1872 (Add a Comment)
|
|
|
|
|
Orin (BNSF)
|
BNSF
|
A BNSF coal load is coming down Main Two at Bill continuing its journey east out of the Powder River. On Main Four (to the left), a UP coal load is stopped at the depot in Bill waiting for a fresh crew. Maintenance is never ending along the tracks here...note the front end loader to the right moving along an access road.
Email Questions or Comments to the Webmaster
or add a comment to the picture.
|
|
|
|
|
|
|