ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Photo ID: 105510
Date Shot
Photo By
Friday, August 14, 2015 Kevin Morgan
Location
Times Viewed
Bozeman Tunnel
Park County, MT
1578
(Add a Comment)
Subdivision
Railroad
2nd Subdivision (MRL) BNSF, Montana Rail Link
When the Northern Pacific originally built up and over Bozeman Pass in 1882, the tracks passed through a 3,652-foot-long tunnel. In 1945, Northern Pacific replaced the tunnel with the current 3,015-foot-long tunnel. You can clearly see the portal of the original tunnel here, now fenced off and largely covered in dirt and foliage. I do not know exactly why the replaced the tunnel...if you have information on this, feel free to leave it in the comments!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 105509
Date Shot
Photo By
Friday, August 14, 2015 Kevin Morgan
Location
Times Viewed
Bozeman Tunnel
Gallatin County, MT
1767
(Add a Comment)
Subdivision
Railroad
2nd Subdivision (MRL) BNSF, Montana Rail Link
Bozeman Tunnel may only be 3,015 feet long, which is short when compared to the 6.2-mile-long Moffat Tunnel, but that doesn't mean it doesn't get a lot of exhaust! When a coal train such as this one is working to make it over the summit, the tunnel quickly fills with a lot of exhaust. It is not a place you'd want to be caught when a train came charging through.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 105508
Date Shot
Photo By
Friday, August 14, 2015 Kevin Morgan
Location
Times Viewed
Bozeman Tunnel
Gallatin County, MT
1650
(Add a Comment)
Subdivision
Railroad
2nd Subdivision (MRL) BNSF, Montana Rail Link
Got exhaust? This westbound BNSF coal train has just about made it to the top of Bozeman Pass (note the sign trackside that says "summit"). Evidence of just how hard the engines are working is apparent as a plume of exhaust accompanies the units upon existing the west portal.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 105507
Date Shot
Photo By
Friday, August 14, 2015 Kevin Morgan
Location
Times Viewed
Bozeman Tunnel
Gallatin County, MT
1186
(Add a Comment)
Subdivision
Railroad
2nd Subdivision (MRL) BNSF
A westbound BNSF coal train has nearly made it over the summit of Bozeman Pass. It is about to emerge from the 3,015-foot-long Bozeman Tunnel and begin its descent down the western slope.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 105494
Date Shot
Photo By
Friday, August 14, 2015 Kevin Morgan
Location
Times Viewed
Bozeman Tunnel
Gallatin County, MT
1589
(Add a Comment)
Subdivision
Railroad
2nd Subdivision (MRL) BNSF
This BNSF grain train has reached the 5,702 ft high Bozeman Pass. Train pass through Bozeman Tunnel at the top, which is 3,015 feet long. The west portal of the tunnel exits in to a cut, which is seen here.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.