ColoradoRailfan.com » Photo Gallery » Photo Search » View Photos

Previous Page     Next Page

Photo ID: 102629
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1757
(2 Comments Posted)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
How many tractors can you count in this shot!? Note the clearly missing retaining wall on the right side of the picture. Going to be awhile before Light Rail service is restored!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102628
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1864
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
Debris is being dumped into the gondola on Main 3. If you look closely at Main 1, you can see a gap in the rail. I believe everything south of this gap will be ripped up and replaced with new track.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102627
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
2093
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
A look south toward the derailment site. You can see where Main 2 has clearly been removed so work crews can cleanup the mess. Main 3 appears to be mostly intact. A bit of tamping and regulating will no doubt be necessary!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102626
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1734
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
The work train being used to haul away scrap (and replace track with track panels) sits on Main 3. Tractors run up and down Main 2 and Main 1, dumping debris into the gondola in the distance.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102625
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1554
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
Along the Littleton Light Rail station, debris consisting of broken concrete ties is being loaded into this tractor. The tractor will haul the ties away and dump them into one of the gondolas on the work train in the foreground.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102624
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1460
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
Some more loading going on. I'm not sure if the derailment took out the retaining wall (to this degree), or if it was damaged beyond repair and the crews ripped it down...
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102623
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1846
(1 Comment Posted)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
I took this shot looking down on Main 2 and Main 3 just so you could not the debris scattered everywhere. Notice the broken wheel laying next the rail head of Main 3. For those curious, molten sulfur (which is what the derailed train was carrying) is used in producing sulfuric acid, matches, detergents, insecticides and a few other things.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102622
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1631
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
One tractor picks up debris from the retaining wall and load it into another. That tractor will then take the debris down to a work train (gondolas) and dump it in there to be hauled away.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102621
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1671
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
A look down into the trench where the derailment of the molten sulfur train occurred about 36 hours earlier. Molten sulfur isn't toxic, just a bit smelly and very hot! "Molten" sulfur is really just heated elemental sulfur. Over 200 degrees, sulfur becomes "molten". It is dark red in color and had a consistency similar to lava.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102620
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1932
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
This shot wasn't accessible the day before as Littleton's finest had the area blocked off. Note that Main 1 has been removed as well as the northbound track for Light Rail!
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102619
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1777
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
At this point, all the tank cars are out of the way. Much of Main 1 is gone right now, and Main 2 is missing or in bad shape as well. Main 3 doesn't need too much work to get it operational. Note the gondolas (which are on the back end of a work train) on Main 3 in the distance.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102618
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1585
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
You can see where much of the retaining wall has been completely removed. The CAT in the foreground is on the road bed for Main 1. You can see that Main 2 has been removed as well.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102617
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
1767
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
I title this picture "Ties and Axles"! All the discarded (and destroyed) concrete ties and wheel sets have been piled up near the south end of the derailment.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102616
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 10
Littleton, CO
2096
(Add a Comment)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
Crews are working to tear down what remains of the damaged retaining wall separating the freight tracks from Light Rail.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Photo ID: 102615
Date Shot
Photo By
Sunday, January 18, 2009 Kevin Morgan
Location
Times Viewed
MP 11
Littleton, CO
2007
(1 Comment Posted)
Subdivision
Railroad
Colorado Springs (UP)/Pikes Peak (BNSF) BNSF
The last five cars from the derailment of the "Stinky Slinky" are being brought out of the Littleton Trench using two tractors. The one closest to the camera is pushing and the one in the distance is ensuring they don't run away. From right to left, the tracks are southbound Light Rail, northbound Light Rail, Main 1, Main 2 and Main 3.
Email Questions or Comments to the Webmaster or add a comment to the picture.

Previous Page     Next Page

Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.